Wednesday, December 21, 2011







Fitting the cab sheet metal and installing wiring and guages.

Saturday, November 26, 2011



I've been addding engine components and some wiring.

Thursday, November 10, 2011








Engine assembled, painted and installed with the transmission




Monday, October 31, 2011




Finally got the engine back form the machine shop and installed the crank. NOS bearings sealed in plastic


Thursday, September 8, 2011




Still waiting for the engine, but got the drivers side tim pretty much on.


Friday, September 2, 2011





Still waiting on the engine block to get back form the shop, but got the brake system installed and starting on the cab.


Saturday, August 13, 2011

Saturday, June 18, 2011

Getting ready to cut off the rusted out stake pockets.

Thursday, May 19, 2011








rear axle assembled and installed on frame




Friday, April 29, 2011










Transfer case installed, rear axle parts blasted, primed and painted





Monday, March 28, 2011

Sunday, February 13, 2011



The front axle has been rebuilt as well as the brakes.

Tuesday, January 18, 2011





Sandblasted, primed and painted front axle and installed on frame

Saturday, January 1, 2011


I have the transmission almost rebuilt. The engine block is getting checked out and I have the front axle apart and ready to cleanup.